Project title: Arlington-East Arlington Village Wastewater Study
Proposal due date: Responses due August 31, 2022 at 2 pm
The Town of Arlington, Vermont is seeking Statements of Qualifications (SOQ) from qualified
engineering firms detailing the firms’ qualifications, technical expertise, management and staffing
capabilities, references, and related prior experience. Required professional services will initially
include a needs assessment and feasibility study and may be amended to include: preliminary
engineering services, design- and construction-related services, preparation of bidding and contract
documents, answering questions on the project associated with a separate study on the finance and policy associated with project implementation, participation in the evaluation of bids received, and monitoring and inspection of construction activities to ensure compliance with plans and specifications.
The Town seeks initially to conduct a Village Wastewater Feasibility Study to include a
feasibility study for Arlington Village and East Arlington Village and areas immediately adjacent to them, including a feasibility level analysis for decentralized wastewater system(s).
The feasibility analysis shall cover four areas of concern:
- This feasibility analysis will consider the potential for expansion or improvement of the existing plant located at the Arlington School, Direct Discharge Permit No. 3-1372 to serve additional properties, otherwise referred to as Area 1 on the attached map.
- It will also include the analysis of new treatment areas for Areas 2, 3, and 4 on the attached map.
The Town notes that there have been multiple past studies of wastewater solutions for the Town or sub-areas thereof over the course of approximately 50 years. It further notes that as a general matter, there is limited open land outside the floodplain available for potential wastewater use. The Town further acknowledges that there are few, if any, existing, unencumbered government landholdings suitable for potential wastewater use. The town will make available what studies it has on request. Request the documents by contacting the Town Administrator at the information provided below.
Attention is directed to the fact that the proposed project may be undertaken with a variety of
Federal and State funds, including initial funding of up to $100,000 through the Vermont Department of
Environmental Conservation Engineering Planning Advance Program, with potential future work to
be funded by the Clean Water State Revolving Fund, and that all work will be performed in
accordance with the regulations issued by such agencies and the State of Vermont pertaining
thereto.
Procurement of said services will be through a Qualifications Based Selection (QBS) and will be in
accordance with elements of the procurement process in 40 U.S.C. § 1101-1104. The Town is not
seeking detailed scope of services of cost proposals at this time, however both will be requested
once the most qualified firm is selected. Qualified firms/candidates interested in being considered
for this project must submit seven (7) copies each and one (1) digital copy (cloud or flash drive) containing the following: (1) A letter of interest; (2) A statement of qualifications and experience of staff persons who will be involved with the project; (3) References; and (4) Related prior experience. Submit the requested information no later than 2:00 PM on August 31, 2022 in order to receive consideration.
Title: Request for Qualifications
Nick Zaiac, Town Administrator
PO Box 304
Arlington, VT 05250
Or by placing the documents in the drop box located at the front of Arlington Town Hall located at 3828 VT Route 7A, Arlington VT 05250
The Town shall evaluate the statements of qualifications and performance data and other material
submitted by interested firms and select a minimum of three firms which, in its opinion, are best
qualified to perform the desired services. Interviews with each firm selected shall be conducted,
which may include discussions regarding anticipated concepts and proposed methods of
approach.
Criteria include experience in the State of Vermont including familiarity with Vermont state wastewater programs, experience designing projects involving federal funds.
The Town shall rank, in order of preference, these three professional firms deemed to be
the most highly qualified to provide the services required, and shall commence scope of services
and price negotiations with the highest qualified professional firm for engineering services.
The selection of a consultant shall be made without regard to race, color, sex, age, religion, national origin, or political affiliation. The Town of Arlington encourages proposals from qualified Minority or Women Owned Business Enterprises (M/WBE).
A timeline for the submission and review process is below.
RFQ posted: June 7, 2022
Questions must be submitted to the Wastewater Subcommittee: August 1, 2022
SOQs due: August 31, 2022
Ranking Decision and Interview Invitations: September 1, 2022
Town will respond by: September 8, 2022
Interview with Wastewater Subcommittee: September 15, 2022
Present recommendation to Select Board and Select Board final decision: September 26, 2022
Contract negotiations to proceed promptly thereafter
Project completion target date winter 2023-2024
Disclaimers
1. Those submitting SOQs do so entirely at their own expense. There is no express or implied
obligation by the Town of Arlington to reimburse any entity or individual for any costs incurred in
preparing or submitting of proposals, preparing or submitting additional information requested by
the Town, or participating in any selection interviews.
2. The Town of Arlington reserves the right to withdraw this Request for Qualifications, to accept or
reject any or all statement of qualifications, to advertise for new statement of qualifications if it is in
the best interest of the Town to do so, and to award a contract as deemed to be in the best interest
of the Town.
All questions pertaining to the RFQ should be submitted to Nick Zaiac, Town Administrator by email by at nick.zaiac@arlingtonvermont.org. Responses will be answered as quickly as possible and posted on
the Town’s website.
Map below